SEG A/S

January 2024

Hashøj District Heating

In collaboration with Eurotherm, SEG A/S has delivered a complete flue gas condensing system for a 2MW wood chip boiler at Hashøj District Heating. The plant has met all expectations and has been delivered to the customer in 2022. SEG's Scope

Åbybro district heating

SEG A/S has delivered a complete flue gas condensing system for a 12MW wood chip boiler at Åbybro District Heating. The system has met all expectations and provides a boiler efficiency of 116% (measured over three months) when firing with wet wood chips with 45% moisture content. Torben Stenbroen, Operations Manager at Åbybro District Heating says about the project: "We are very pleased with the collaboration and the solution...

Åbybro district heating Read more "

Vestervig District Heating

A 1.2 MW air-to-water heat pump in combination with a 2,000 m3 accumulation tank was designed, installed and commissioned at Vestervig District Heating in 2021. Fenagy has supplied the heat pump including evaporators and a stand for the system. In terms of control, a simple communication with the existing SRO system has been established, and in addition, there is cooperation with the electricity wholesaler, where on a daily basis ...

Vestervig District Heating Read more "