Completed projects Completed projects SEG A/S 2004 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2019 Hammel District Heating Flue gas condensation of 12 MW straw boiler Objective: Improved... Read the full article 2019 THISTED HEAT SUPPLY – 4.8 MW heat pump 4.8 MW heat pump SEG A/S has delivered, installed... Read the full article Åbybro district heating SEG A/S has delivered a complete flue gas condensing plant... Read the full article Amager hill ARC FLUE GAS CONDENSATION Objective: Improved efficiency... Read the full article Egedal District Heating FLUE GAS CONDENSATION Objective: Improved efficiency... Read the full article District heating Funen Objective: Improved efficiency of boiler plants by flue gas condensation. SEG... Read the full article Fritz Egger GmbH & Co. in Austria Purpose and operation of the project: To produce cold... Read the full article Gråsten District Heating Purpose and operation of the project: To cool the flow temperature... Read the full article Hammel District Heating FLUE GAS CONDENSATION Objective: Improved efficiency... Read the full article Hashøj District Heating SEG A/S has, in cooperation with Eurotherm, delivered a complete... Read the full article Hillerød Utility Purpose and operation of the project: In connection with... Read the full article HKV Horsens Objective: Improved efficiency of waste boiler for... Read the full article Hofor amagerværket – Geothermal plant To produce district heating water with a flow temperature... Read the full article HOFOR Fjernkøle A/S, Copenhagen Purpose and operation of the project: To produce district cooling... Read the full article HURUP DISTRICT HEATING 2 – FLUE GAS CONDENSATION Objective: Improved efficiency of wood chips for district heating water SEG... Read the full article Hurup District Heating a.m.b.a Purpose and operation of the project: To improve cooling... Read the full article KARA/NOVEREN I/S Purpose and operation of the project: To provide comfort cooling... Read the full article Lemvig District Heating Objective: Improved efficiency of shredder through... Read the full article Renova Waste Incineration Gothenburg PHASE I, GOTHENBURG – FLUE GAS CONDENSATION Purpose: Replacement... Read the full article Ry Varmeværk a.m.b.a Objective: Improved efficiency of wood chips for district heating water SEG... Read the full article Sæby Varmeværk a.m.b.a Objective: Improved efficiency of gas engine installations SEG... Read the full article South Langeland District Heating a.m.b.a Purpose and operation of the project: To cool the flow temperature... Read the full article Tarm Varmeværk a.m.b.a Purpose and operation of the project: To improve cooling... Read the full article Thisted District Heating FLUE GAS CONDENSATION ON STRAW Objective: Improved efficiency... Read the full article Thisted Heat Supply FLUE GAS CONDENSATION AND GEOTHERMAL ENERGY Thisted Varmeforsyning... Read the full article Velux A/S Purpose and operation of the project: To provide comfort-... Read the full article Vestervig District Heating Objective: Improved efficiency of shredder With... Read the full article Vestervig District Heating A 1.2 MW air-water heat pump in combination with a... Read the full article Wattens Papirfabrik Austria Objective: Improved boiler efficiency SEG has... Read the full article No posts found