SEG A/S

2013

KARA/NOVEREN I/S

Project purpose and mode of operation: To provide comfort cooling for the new CHP plant - the Energy Tower. Comfort cooling for the ventilation system and server rooms. The absorption chiller's chilled water circuit produces cold water down to around 10°C, which is exchanged with the comfort cooling circuit. The absorbed heat from the comfort cooling circuit is directed back to the chiller's evaporator, which transfers the energy to the chiller's absorber. The absorber is traversed by the cooling ...

KARA/NOVEREN I/S Read more "

South Langeland District Heating a.m.b.a

Project purpose and mode of operation: To cool the flow temperature of the water to the district heating plant's new solar collector system and thereby increase the efficiency of the solar collectors. The absorption chiller can provide 500 kW. Effective collector area of 12,500 m2 with an expected annual production of 7,500 MWh. The absorption chiller's chilled water circuit produces cold water down to around 15°C, which is exchanged with the solar collector circuit. Energy is absorbed from the flow water ...

Sydlangeland Fjernvarme a.m.b. a Read more "