SEG A/S

2016

Thisted Heat Supply

FLUE GAS CONDENSATION AND GEOTERMI In 2016, Thisted Varmeforsyning was supplied with a new 3.7 MW hot water driven heat pump for flue gas condensation. The heat pump cools flue gases from the boiler down to around 24°C and delivers the energy to the absorber and condenser side by heating district heating water from 42°C up to 74°C. The driving energy is hot water at around 150°C is directed to the heat pump's ...

Thisted Varmeforsyning Read more "

Lemvig District Heating

Purpose: Improved efficiency of wood chip boiler through condensation In November 2016, SEG A/S delivered, installed and commissioned a new 5G3MC absorption heat pump with a cooling capacity of 900 kW. On the cooling side of the heat pump, cold water is supplied to the flue gas scrubber, which cools down the chimney temperature to close to 18°C, thus absorbing and recovering the condensation heat from the flue gases. This recovered energy is delivered back ...

Lemvig District Heating Read more "

Hammel District Heating

FLUE GAS CONDENSATION Purpose: Improved efficiency of waste boiler through flue gas condensation In November 2016, SEG A/S commissioned a 5G5NP absorption heat pump with a cooling capacity of 1MW. On the cooling side, cold water at around 23°C is supplied to the flue gas cooler. The heat absorbed by this cooling is delivered to the heat pump's condensers and absorber, heating the district heating water before the boiler. Driving energy is supplied from the waste boiler...

Hammel District Heating Read more "