Gråsten District Heating

Project purpose and mode of operation: To cool the flow temperature of the water to the district heating plant's solar collector system installed in 2012 and thereby increase the efficiency of the solar collectors. The absorption heat pump can provide 700 kW. Effective collector area of 19,024 m2 with an expected annual production of 9,700 MWh. The absorption heat pump's chilled water circuit produces cold water down to around 13°C, which is used to exchange with the solar collector circuit. ...

Gråsten District Heating Read more "

Hillerød Utility

Project purpose and mode of operation: In connection with the construction of a new wood chip-fired plant in 2011, SEG A/S was to supply an absorption chiller. The purpose was to achieve better cooling of the flue gas from the plant's wood chip plant and thereby increase efficiency. Using the absorption chiller and associated scrubber system, the flue gas temperature is currently around 35°C. The cooling capacity is 500 kW. ...

Hillerød Water Supply Read more "

Velux A/S

Project purpose and mode of operation: To provide comfort and server room cooling for Velux's office facilities. The absorption chiller's chilled water circuit produces cold water down to around 14°C, which is exchanged with the comfort cooling circuit. The absorbed heat from the comfort cooling circuit is directed back to the chiller's evaporator, which transfers the energy to the chiller's absorber. The absorber and condenser are usually connected in series, but Velux can...

Velux A/S Read more "

HOFOR Fjernkøle A/S, Copenhagen

Project purpose and mode of operation: To produce district cooling (cold water) for businesses around Kongens Nytorv. The cooling center on Adelgade has a cooling capacity of approx. 18 MW, where the options are free cooling (direct cooling using seawater), absorption cooling (surplus heat from Amagerværket) and finally compressor cooling. The absorption heat pump installed at Adelgade has a cooling capacity of 3.4 MW. The absorption heat pump's chilled water circuit ...

HOFOR Fjernkøling A/S Copenhagen Read more "

Fritz Egger GmbH & Co. in Austria

Project purpose and mode of operation: To produce cold process water for their wood products production and flue gas condensation at the plant's waste incineration. The cooling capacity is 6 MW. The absorption heat pump chilled water circuit produces chilled water. Energy from the process and flue gas condensation is absorbed in the chilled water circuit and fed back to the heat pump evaporator. The evaporator transfers the energy to the heat pump absorber. The absorber is ...

Fritz Egger GmbH & Co. in Austria Read more "

Hofor amagerværket – Geothermal plant

To produce district heating water with a flow temperature of around 85°C. The main components of the plant consist of 2 geothermal boreholes at a depth of approximately 2.6 kilometers, where the temperature is around 73°C. 3 Thermax G119 absorption heat pumps connected in series, which together have a cooling capacity of 10 MW. By connecting absorption heat pumps in series, it is possible to create a ...

Hofor amagerværket - Geothermal plant Read more "